The key objective of this call by Nile Basin Initiative (NBI) is to conduct economic assessment of wetland ecosystem services as an input green infrastructure planning and development for the lower Ba..
Flood risk maps for pilot areas along the Blue Nile River in Sudan: Khartoum City (covering part of Khartoum City along the Blue Nile and the proposed development area at Soba), Hasahisa and Wad Medan..
Flood risk maps for pilot areas surrounding Lake Tana in Ethiopia: Gumara and Ribb Rivers in the Fogera floodplain; and (2) Megech and Dirma Rivers in the Dembiya floodplain. Flood extent map convey b..
Manual of basic principles used in the design and construction of flood protection embankments and associated structures in Sudan, useful for engineers and institutions responsible for designing and c..
Manual of basic principles used in the design and construction of flood protection embankments and associated structures in Ethiopia, useful for engineers and institutions responsible for designing an..
Community Action Plans for four pilot communities (Wagettera, Nabega, Gendawuha and Ttez Amba) around flood affected communities in the Fogera Floodplain, prepared based on a participatory consultati..
Community Action Plans for four pilot communities (Toti Island, Wawsi, Elabka and Sidon) in the Blue and Main Nile Floodplain areas in Sudan, prepared based on a participatory consultative planning p..
Report of a commissioned study on setting up a drought monitoring, forecasting, and early warning system for the Eastern Nile Basin. The methodology consisted of a historic reconstruction of climate a..
Report of the study of flash floods in the Eastern Nile region, an issue identified based on a review of the FFEWS (created under the World Bank supported Eastern Nile Planning Model project (2009-13)..
South Sudan Country Report of the enhancement of flood forecasting and early warning systems (FFEWS) in the Eastern Nile region, identified based on a review of the FFEWS (created under the World Bank..